A high-speed logistics sorting center project located in Thailand - which takes only 4 months from production to installation - demonstrating excellent efficiency. The characteristics of this project are:
About 200 loading and unloading docks
Double layered cross belt sorting equipped with 400 sorting ports
Peak processing capacity: 50000 packages/h
Daily processing: over 1 million packages
Real time WMS monitoring for seamless operation
This turnkey solution demonstrates our ability to deliver large-scale high-performance systems at record speed.
#Logistics Innovation # Fast Delivery # Excellent Automation